{"id":426,"date":"2018-12-20T15:59:00","date_gmt":"2018-12-20T15:59:00","guid":{"rendered":"http:\/\/www.vopakterquimsa.com\/ca\/?p=426"},"modified":"2021-04-22T16:00:02","modified_gmt":"2021-04-22T16:00:02","slug":"primer-tren-carregat-en-el-nou-espai-de-vopak-terquimsa","status":"publish","type":"post","link":"https:\/\/terquimsa.com\/ca\/primer-tren-carregat-en-el-nou-espai-de-vopak-terquimsa\/","title":{"rendered":"Primer tren carregat en el nou espai de Vopak Terquimsa"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">La primera operaci\u00f3 de c\u00e0rrega ferrovi\u00e0ria en el nou espai de la terminal de Vopak Terquimsa del Port de Barcelona \u00e9s ja una realitat. La nova operativa permet a la companyia posar a la disposici\u00f3 dels seus clients una instal\u00b7laci\u00f3 de primer nivell per a la log\u00edstica de granels l\u00edquids per ferrocarril.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El nou espai ha suposat una inversi\u00f3 pr\u00f2xima a un 1 mili\u00f3 d&#8217;euros. La infraestructura instal\u00b7lada a la terminal ferrovi\u00e0ria p\u00fablica del moll de l&#8217;Energia del Port de Barcelona compta amb 345 m2 i t\u00e9 capacitat per a operar composicions de fins a 14 vagons (210 metres).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El nou espai ferroviari disposa d&#8217;ample mixt, podent carregar vagons d&#8217;ample ib\u00e8ric com d&#8217;ample europeu, permetent aix\u00ed ampliar el&nbsp;<em>hinterland<\/em>&nbsp;de Vopak Terquimsa al sud d&#8217;Europa. Eduardo Sa\u00f1udo, Director General de Vopak Terquimsa assegura que \u00abamb aquesta nova infraestructura Terquimsa permet connectar Barcelona amb Europa per ferrocarril en ample europeu, ampliant aix\u00ed les nostres possibilitats de ser competitius com a port a l&#8217;hora de posar productes a Europa\u00bb<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aquesta nova infraestructura de Vopak Terquimsa destaca el comprom\u00eds amb Barcelona i s&#8217;emmarca dins del Pla Estrat\u00e8gic del Port de Barcelona que aposta per la intermodalitat. La fita \u00e9s donar m\u00e9s flexibilitat a la terminal, permetent al Port de Barcelona mantenir el seu lideratge com a principal node log\u00edstic del Mediterrani.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La primera operaci\u00f3 de c\u00e0rrega ferrovi\u00e0ria en el nou espai de la terminal de Vopak Terquimsa del Port de Barcelona \u00e9s ja una realitat. La nova operativa permet a la [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":427,"comment_status":"open","ping_status":"open","sticky":false,"template":"single-news.php","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-426","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualidad"],"_links":{"self":[{"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/posts\/426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/comments?post=426"}],"version-history":[{"count":1,"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/posts\/426\/revisions"}],"predecessor-version":[{"id":428,"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/posts\/426\/revisions\/428"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/media\/427"}],"wp:attachment":[{"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/media?parent=426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/categories?post=426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/terquimsa.com\/ca\/wp-json\/wp\/v2\/tags?post=426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}